An assembled YilPlat platform, eleven triangular panels

Why YilPlat

A team from inside the industry engineered the platform the industry was missing.

Patented, fully demountable, about a tonne of galvanised steel; more than 800 sold.

The story

The first was for our own showroom; the 800-plus since then, for other dealers.

Our showroom needed a turntable; the ones on the market kept breaking down, so we designed our own.

Today more than 800 YilPlat platforms turn in 12 countries; CE marked, ISO 9001 certified.

Who uses it
2014
First platform, Düzce
800+
platforms sold in 12 years
≈1 t
galvanised steel per platform
Patented
Our own design, our own R&D

Five differences

What sets it apart from a standard turntable?

Galvanised steel triangular panels on a pallet

About a tonne of 100% galvanised steel.

11 triangular panels, each on 6 wheels; a 5,000 kg SUV drives on without harm.

≈1 t steel · 66 wheels · 5,000 kg

Product detail
The YilPlat platform in the Aktoy · Xchange by Toyota showroom

Installed in an afternoon.

Never touches your floor.

No pit, anchors or welding on site; ramps to drive on. Marble, parquet, tile or concrete stays as it is.

8.5 cm · on the floor · zero damage

Installation
A palletised YilPlat platform loaded into a lorry

Down in 40 minutes, up again somewhere else.

New showroom, branch or show stand: it comes down, goes on a pallet and is reinstalled. The investment stays with you, not the building.

40 min dismantle · pallet · reinstall

Dismantling and relocation
Ramp panels with the customer's logo cut into them — DapCars and ONYX

Nothing is welded shut.

Every part is replaced on its own.

If a wheel, motor or panel wears out, only that part is replaced; the rest keeps working.

Single-part replacement · decades · 2-year warranty

Parts and service life
Real installation

Installed by our team in 2.5 hours.

Take delivery in the morning, turn the first car in the afternoon: our team installs it in about 2.5 hours and shows your staff how to run it.

Our team · 2.5 hours · no building work

Installation steps

It earns its price. The reason is simple.

A turntable's real cost is not on the invoice.

What happens with a welded turntable

  • Breakdown: the disc stops, the car sits in the middle of the window; every wait for a repair is a lost day.
  • Welded parts: the failed part cannot be swapped; a welder, or a whole new disc.
  • Floor damage: anchors and pits cost you again when you leave the showroom.

What happens with YilPlat

  • We send the worn part; it swaps out with hand tools.
  • No welds, no pit: the floor stays as you found it.
  • Even in a power cut, loosen the motor stops and the platform turns by hand.
  • Our technical team answers within one working day; 2-year warranty.

Buy once. Use for decades.

Pit turntable, welded turntable or YilPlat?

Floor

YilPlat

Sits on the existing floor — zero damage

Welded turntable

Anchors or welding; the floor takes the damage

Pit (recessed) turntable

Pit and reinforced concrete; the floor is changed for good

Installation time

YilPlat

Our team, about 2.5 hours, no building work

Welded turntable

Site labour; ask the maker how long

Pit (recessed) turntable

Building works: excavation, concrete, curing

Demountable

YilPlat

Completely — in 40 minutes, with hand tools

Welded turntable

Welded sections cannot be dismantled

Pit (recessed) turntable

No — fixed to the building

Part replacement

YilPlat

Every part is replaced on its own

Welded turntable

A welded part cannot be replaced on its own

Pit (recessed) turntable

Requires access under the floor

Load-bearing structure

YilPlat

About a tonne of 100% galvanised steel; 5,000 kg capacity

Welded turntable

Is it galvanised, and how much steel?

Pit (recessed) turntable

Steel structure inside a reinforced-concrete pit

Warranty

YilPlat

2 years (Atelier: 3 years) · support within one working day

Welded turntable

Who sends spares, and when?

Pit (recessed) turntable

Varies by maker

We name no competitors and quote no statistics; the middle columns summarise what to ask before you buy.

Ask us the same questions — the answers are in the YilPlat column.

Message on WhatsApp

The good dealerships already have one.

Filmed in customer showrooms; no sets, no renders.

Sante MotorsMaserati · showroom
Platin MotorsMercedes-Benz G-Class · showroom
S&S MotorsMercedes-Benz G-Class · showroom
Yıl-Bağ GrupDome-lit showroom

Create the order for your showroom.

Standard finishes ship within 20 working days.

Get a quoteWhatsApp